Source and protection
Meter, backflow, shutoff, pressure information, and access notes.
A strong contractor handoff connects the water source, controller, station, valve, linework, served area, schedule, condition, and repair history in one property record.
The next contractor should be able to locate critical components, understand which controller station operates each zone, trace the likely line path, see known deficiencies, and confirm what was field-verified.
Independent pins are not enough. The important information is the relationship between each component and the area it serves.
Meter, backflow, shutoff, pressure information, and access notes.
Controller, program, station assignment, master valve, and sensors.
Zone valves, mainlines, laterals, drip lines, sprinkler heads, and coverage.
Zone schedule, photos, condition, repairs, open issues, and verification date.
The guided example shows how a read-only link gives vendors context without giving them edit access.